Project Update – June 2022

The concrete at the first, second and sally port floors has been poured. Concrete block wall construction has started at the detention area, stair wells and elevators. Exterior wall framing has started. Blocking at the roof is on going.

2nd-floor-concrete

Image 1 of 8